Rethink Concrete Roof Sequencing - Build Sooner with SlopeShield Plus SA

SlopeShield Diagram WebImage 01SlopeShield Plus SA gives contractors the flexibility they need with today's demanding schedules and labor-challenged market.

Benefits:

  • Apply as early as day-6 after a concrete pour or directly to damp concrete during reroofing
  • Prevents weather-related rewetting enabling early dry-in
  • Allows interior trades to safely begin BEFORE completing 28-35 day cure cycle
  • Eliminates curing calendar resets avoiding costly setbacks
  • Streamlines sequencing, protects the structure, keeps project moving
  • Saves time, labor, and expensive project setbacks

SlopeShield Icons Sidebyside 01

 

Green, Fresh Pour Structural Concrete

Install SlopeShield Plus SA over green concrete a minimum of 5 days after pour. Ensure the surface is dry to the touch and meets all the required preparation requirements published in the installation instructions.

Construct Pour Protect Roof Deck
Construction screenshot 1 Construction screenshot 2 Construction screenshot 3
Structural concrete roof preparation Minimum 5-day cure time, apply SlopeShield Plus SA on day 6 or thereafter Apply SlopeShield Plus SA to partially cured concrete, interior trades can begin

 

Lightweight Insulating Concrete

SlopeShield Plus SA can be applied to  lightweight insulating concrete. Substrate preparation includes priming the surface with sodium silicate approximately two days after the pour to lock in free lime and stabilize the surface chemistry.

Construct Pour/Prepare Protect Roof Deck
Construction screenshot 1 Construction screenshot 2 Construction screenshot 3

Lightweight concrete roof preparation

Minimum 5-day cure time, prime within two days, apply SlopeShield Plus SA on day 6 or thereafter

Apply SlopeShield Plus SA to partially cured concrete, interior trades can begin

 

Advantages of SlopeShield Plus SA Over Concrete

SlopeShield Plus Concrete Roof Building Open 080425

VS Evergreen HS 11

Applying SlopeShield Plus SA on day-6 of the cure process:

  • Allows interior trades to begin work safely and sooner
  • Eliminates curing calendar resets to avoid costly project delays
  • Prevents weather-related rewetting and enables early dry-in
Upon full cure, 28 to 35 days, SlopeShield Plus SA creates a walkable surface with excellent traction and supports construction equipment

 

Reroof: Damp Concrete

During reroofing, damp concrete is often uncovered, causing delays while it dries. Applying SlopeShield Plus SA eliminates rewetting—even after rain—reducing schedule uncertainty and maintaining interior operations.

Remove Protect Remain Operational

VS Moisture Laden Concrete

VS SlopeShield SA and Concrete VS SlopeShield SA Building

Damp concrete is exposed

Apply SlopeShield Plus SA to damp concrete

Concurrent drying and protection maintains project momentum

 

Cure Times and Installation Guidance

SlopeShield Plus SA does not accelerate the natural curing process of concrete; proper curing is still essential for substrate integrity and performance. While SlopeShield Plus SA protects the concrete from external moisture and allows internal vapor to escape, VaproShield recommends allowing 28 to 35 days of curing from the pour date before installing the final roofing system. This guideline aligns with industry standards to ensure optimal results.

Continue the Conversation With Us
Take Our Webinar Icon Request a Roof sample Icon Start Your Mass Timber Protection Plan

 

Concrete Roof Deck Protection Resources

Related Products

 

REGISTER FOR OUR WEBINARS TODAY