KZF Architects
Products
WrapShield IT Integrated Tape
The building, originally built in 1915, was completely renovated in early 2010.
PROJECT DESCRIPTION
Over 2000 s/f of WRAPSHIELD® Black was used on the renovation project for KZF Architect's new office building. All 36,000 s/f of the building was renovated and, with its new products and features, reaches LEED silver certification. The project wrapped up in early spring of 2010.
The WRAPSHIELD® was chosen as a weather barrier, to go behind the Trespa façade system, because of the 50 perm rating combined with the best properties of a vapor permeable membrane and air barrier in one product.